Burnt River UPRR Bridge

PROJECT 1

2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015

This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.

Willamette Loop, Dorris Ranch

Project 2

2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015

This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.

Calapooya Bridge Replacements

Project 3

2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015

This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.

Butte Creek/Jacks Bridge

Ohio Bridge

2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015

This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.

Corvallis Highway 20/34 Bypass

Project 5

2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015

This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.

McCullough Bridge

Project 6

2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015

This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.