PROJECTS
-
Burnt River UPRR Bridge
PROJECT 1
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
Willamette Loop, Dorris Ranch
Project 2
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
Calapooya Bridge Replacements
Project 3
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
Butte Creek/Jacks Bridge
Ohio Bridge
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
Corvallis Highway 20/34 Bypass
Project 5
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
McCullough Bridge
Project 6
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
Sandy River Bridges
Project 7
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
FFO Troutdale Interchange, Marine Drive
Project 8
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
Commercial Street and Kuebler Boulevard Street Improvements
Project 9
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
2015 Gain Share Project
Project 10
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
80th Avenue Culvert Replacements
Project 11
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
Foster Road Street Improvements
Project 12
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.
-
Burnside Street Improvements
Project 13
2015 // TROUTDALE, OR // ODOT //
DJC TOP PROJECT OF THE YEAR 2015This ODOT OTIA project involved the replacement of two I-84 bridges that were structurally deficient. Our scope included all road construction associated the bridge replacements, structure excavation for end bents, the widening of I-84 eastbound/westbound and eastbound and westbound Jordan Road and ramps, bicycle and pedestrian access and paths, the construction of a temporary detour alignment, retaining walls, drainage and erosion control.